SCHEME ID 3
Data Source CMBC
Scheme Name Repowering of wind farm including construction and operation of nine wind t... more
Repowering of wind farm including construction and operation of nine wind turbines (up to 115 metres to blade tip),
Number Of Turbines 9
X (Easting) 404167
Y (Northing) 431681
Hub M
Rotor Diameter M
Tip M 115.0
Turbine Model NULL
Capacity MW 22.5
Scheme Status Consented
Local Authority Calderdale
Planning Ref 12/00955
Consent Date 15/01/2013
Operational Date
Developer Name
Height Class Large turbine
Group Class 6 to 10 turbines
Edited By LUC
Date last edited 2014-01-06